A Huge Battery Has Replaced Hawaii’s Last Coal Plant
The Kapolei Energy Storage system actually began commercial operations before Christmas on the industrial west side of Oahu, according to Plus Power, the Houston-based firm that developed and owns the project. Now, Kapolei’s 158 Tesla Megapacks are charging and discharging based on signals from utility Hawaiian Electric. The plant’s 185 megawatts of instantaneous discharge capacity match what the old coal plant could inject into the grid, though the batteries react far more quickly, with a 250-millisecond response time. Instead of generating power, they absorb it from the grid, ideally when it’s flush with renewable generation, and deliver that cheap, clean power back in the evening hours when it’s desperately needed.
The construction process had its setbacks, as did the broader effort to replace the coal plant with a roster of large-scale clean energy projects. The Kapolei battery was initially intended to come online before the coal plant retired. Covid disrupted deliveries for the grid battery industry across the board, and Kapolei’s remote location in the middle of the Pacific Ocean didn’t make things easier. By summer 2021, Plus Power was hoping to complete Kapolei by the end of 2022, but it ended up taking another year. Even then, it has joined the grid before several of the other large solar and battery projects slated to replace the coal plant’s production with clean power.
Read more of this story at Slashdot.